• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Greenstone Resources

Greenstone Resources

ASX:GSR

  • Home
  • Corporate
    • Directors & Management
    • Corporate Directory
    • Corporate Governance
  • Projects
    • Burbanks
    • Phillips Find
    • Mt Thirsty
    • Resources & Reserves
  • Investors
    • Investor Dashboard
    • ASX Announcements
    • Company Reports
    • Presentations
  • Contact

Burbanks
Gold Project

The Burbanks Project is located 9km southeast of Coolgardie, Western Australia. The Project includes the Burbanks Mining Centre and over 5km of the highly prospective Burbanks Shear Zone, historically the most significant gold producing structure within the Coolgardie Goldfield.

The Burbanks Mining Centre comprises the Birthday Gift and Main Lode Gold Mines (Figures 1 & 2). The recorded historic underground production at Burbanks (1885-1961) totalled 444,600t at 22.7 g/t Au for 324,479oz predominantly from above 140m below the surface. Intermittent open pit and underground mining campaigns between the early 1980’s to present day has seen total production from the Burbanks Mining Centre now exceed 420,000oz.

The total Indicated and Inferred Mineral Resource for the Burbanks Gold Project is 1.2Mt at 3.7 g/t Au for 145,700 ounces of gold (for more information refer to Resources & Reserves section).

4.0km mineralised trend producing over 420,000 oz which remains untested at depth

Footer

Ground Floor, 6 Thelma Street, West Perth, WA 6005

ua.mo1652765359c.sec1652765359ruose1652765359renot1652765359sneer1652765359g@nim1652765359da1652765359

08 9481 3911

Copyright © 2022 Greenstone Resources • Site by White Noise Communications

Download prospectus